Pike River Coal Limited (PRCL) contracted Brightwater Peat Limited to design and construct a modern coal processing plant for the development of their underground mine on the west coast of the South Island of New Zealand.
The coal was pumped through a slurry pipeline from the underground coal crusher and slurry plant approximately 10.6km down the valley to the processing plant.
Solid Energy New Zealand engaged Brightwater as the head contractor to design, procure, and manage fabrication and construction of the NZ$124 Million green-fields CHPP project, all within a fast-track schedule.
Brightwater were contracted by Pike River Coal Limited (PRCL) to design, manufacture, install and commission all aspects of this project. Brightwater project managed the normal structural and mechanical aspects of the project as well as external trades such as Civil and Electrical.