Laminex MDF plant near Gympie, Queensland Australia, required the replacement of their existing G1 Heat Energy Plant, which has been in production over 20 years. The new heat energy plant had to be engineered to have a design life of 20 years, and would require being in production 360 days a year, 24 hours a day, with a target uptime of 99%.