Brooklyn Cycle Bridge

Client: Downer

Overview:

Downer are one of the main contractors working on the network of cycle trails around the nelson region.

Downer engaged Brightwater to fabricate and paint the new Brooklyn Cycle Bridge.

Solution:

Brightwater have constructed numerous cycle bridges and were able to offer our typical high quality along with quick turnaround for the fabrication and painting.

Brightwater fabricated and painted the bridge in our Nelson workshop and painting facility.

Other Work Examples

Supercritical Marine Lipid Extraction Plant

Supercritical Marine Lipid Extraction Plant

Trojan Marine Excavator Pontoons

Marine Excavator Pontoons

Oceania Dairy 30MW Boiler

Oceania Dairy 30MW Boiler

Aircraft Maintenance Platforms

Aircraft Maintenance Platforms

BT Mining Lime Dose Plant

Lime Dosing Plant

PanPac Biomass Fuel Handling System

Biomass Fuel Handling System

Brightwater Engineering Services