Lime Dosing Plant

Client: BT Mining

Overview:

BT Mining required a lime storage and dosing plant to provide PH correction to the water runoff from their Stockton Mine.

They required a competent contractor with experience in Lime Dosing Plant design to design and build a dedicated facility on the challenging site.

Solution:

Brightwater were able to draw on previous designs and propose a plant to meet BT’s requirements.

Brightwater were able to provide all the design, fabrication, site installation and electrical installation and automation for the plant.The plant included a 90T silo with dust handling and lime metering, 10m3 batch mixing tank, controlled makeup and dosing along with dedicated MCC room and controls.

Other Work Examples

Supercritical Marine Lipid Extraction Plant

Supercritical Marine Lipid Extraction Plant

Trojan Marine Excavator Pontoons

Marine Excavator Pontoons

Oceania Dairy 30MW Boiler

Oceania Dairy 30MW Boiler

Aircraft Maintenance Platforms

Aircraft Maintenance Platforms

Brooklyn Cycle Bridge

Brooklyn Cycle Bridge

PanPac Biomass Fuel Handling System

Biomass Fuel Handling System

Brightwater Engineering Services