Supercritical Marine Lipid Extraction Plant

Supercritical Marine Lipid Extraction Plant

Client: Specialised Health Foods Production Company Overview: Brightwater have completed a new skid-mounted high pressure CO2 extraction plant for a specialist health food processing company. The plant is designed to extract marine lipids from dried powder though a super-critical CO2 pressure process. The extraction is a batch process taking place in either of two extractor…

Read More

Marine Excavator Pontoons

Trojan Marine Excavator Pontoons

Client: Trojan Marine Overview: Trojan Marine Came to Brightwater to design and build a pontoon to support a 12T digger on the water. Brightwater were able to work With Trojan Marine to develop a specific barge to suit their requirements. Solution: Brightwater worked with Trojan Marine and a local Naval architect to refine the design…

Read More

Oceania Dairy 30MW Boiler

Oceania Dairy 30MW Boiler

Client: Oceania Dairy Overview: Oceania Dairy Limited is a wholly owned subsidiary of Inner Mongolia Yili Industrial Group Co. Ltd (Yili), which is listed on the Shanghai stock exchange. Yili is China’s largest dairy producer and its 2015 revenue of US$ 8.6 billion made it the 8th largest dairy company in the world. Oceania’s new…

Read More

Aircraft Maintenance Platforms

Aircraft Maintenance Platforms

Client: Air New Zealand Overview: Air New Zealand was seeking to minimise their operating costs and maximise reliability in relation to the provision of their aircraft maintenance provision. To undertake maintenance on their ATR72-600 & Q300 Dash 8 Aircraft, scaffold was being built around the tail and wings of these aircraft. This scaffold system did…

Read More

Brooklyn Cycle Bridge

Brooklyn Cycle Bridge

Client: Downer Overview: Downer are one of the main contractors working on the network of cycle trails around the nelson region. Downer engaged Brightwater to fabricate and paint the new Brooklyn Cycle Bridge. Solution: Brightwater have constructed numerous cycle bridges and were able to offer our typical high quality along with quick turnaround for the…

Read More

Lime Dosing Plant

BT Mining Lime Dose Plant

Client: BT Mining Overview: BT Mining required a lime storage and dosing plant to provide PH correction to the water runoff from their Stockton Mine. They required a competent contractor with experience in Lime Dosing Plant design to design and build a dedicated facility on the challenging site. Solution: Brightwater were able to draw on…

Read More

Biomass Fuel Handling System

PanPac Biomass Fuel Handling System

Client: Pan Pac Forrest Products Overview During 2001-2002, Pan Pac Forest Products Ltd installed a 36MW Bubbling Fluid Bed (BFB) Boiler. Pan Pac required a Fuel Handling system to store and deliver fuel for the new boiler. The fuel comprises coarse green wood waste and dry shavings, which require storing separately and then delivering to…

Read More