Fonterra Cooperative Steam Condensate Tank

Client: Fonterra
Scope: Fabrication & Site Installation
Timeframe: One month

Overview

Fonterra have a number of sites in the South Island where Brightwater provides maintenance support throughout the year and particularly during the off-season when significant routine maintenance and upgrade work is undertaken.

Typical work undertaken is the inspection and repair of coal and ash conveying systems, pumps and fans, steam lines and valves. Other modification and replacement works are often undertaken, examples of which are the replacement of a steam condensate tank and relining of a coal hopper.

Solution

The condensate vessel was fabricated in Brightwater’s workshop and transported to site where it was lifted into position and connected to the various steam and water pipes. This work was conducted in the processing part of the factory following the red line procedures.

The coal hopper required new lining of the internal surfaces with stainless steel plate for corrosion protection and low friction. The top of the hopper was removed to allow access and the old linings were removed. New stainless sections were lifted into position and attached to the hopper, fully seam welded along all joints.

Other Work Examples

Supercritical Marine Lipid Extraction Plant

Supercritical Marine Lipid Extraction Plant

Trojan Marine Excavator Pontoons

Marine Excavator Pontoons

Oceania Dairy 30MW Boiler

Oceania Dairy 30MW Boiler

Aircraft Maintenance Platforms

Aircraft Maintenance Platforms

Brooklyn Cycle Bridge

Brooklyn Cycle Bridge

BT Mining Lime Dose Plant

Lime Dosing Plant

Brightwater Engineering Services